Painter-Lewis Projects

City of Winchester/ VDOT- Bridge Inspections

The City of Winchester currently maintains a contract with Painter-Lewis, P.L.C.  to perform inspections for the bridge and culvert structures under the City’s responsibility of facility maintenance.  There are currently seven bridge and culvert structures that require bi-annual NHI/FHWA inspections for which the City is responsible.  Painter-Lewis continues to manage and perform these inspection services including a thorough documentation of each structure, categorization of all observed defects, accurate documentation of clearance requirements, and traffic control management.  Additionally, Painter-Lewis prepares detailed inspection reports for each of these structures to be submitted to the regional Virginia Department of Transportation (VDOT) Bridge Manager.  When required by the governing authority, Painter-Lewis includes load rating analyses for these structures.  Painter-Lewis has designed our NHI/FHWA bridge inspection program to specifically service local municipalities which own and/or are responsible for non-VDOT maintained structures.

Project dates: July 2019 - Present

7